Would you ever have thought removing a chimney breast needed permission?
Removing chimney breasts is no easy feet, and there are many things to be aware of before taking action. This article will run you through the requirements of removing a chimney breast, when a surveyor is needed, building regulations, and the process of serving a party wall notice.
Our party wall surveyors in Kent and party wall surveyors in London are here to guide you through the process. Our party wall services are also available in Folkestone and Thanet. Get in touch with our experts for advice.
Can I remove a chimney breast?
Yes – but it isn’t easy.
Chimney breasts are part of a building’s structure, and taking them out should be approached in the same way as taking out a load bearing wall. That’s because the ground floor chimney breast will have the first floor, attic sections of the chimney and the chimney stack itself above it and it will all need supporting properly.
Do I need planning permission to remove a chimney breast?
No, you do not need planning permission to remove a chimney breast (unless it is a listed building, and you may need permission to remove a chimney in a conservation area). However, you do need to seek other permissions, including approval from Building Regulations, and possibly Party Wall Agreement. If your property is listed, or you live in a conservation area, there will be other permissions you may need to seek too. Contact your local authority for advice.
Do I need a surveyor when I am removing a chimney breast?
Yes – it is important you seek the advice of a structural engineer, and, if the chimney breast is on a shared wall, a party wall surveyor. Removing a chimney breast is nearly always more complicated than you think. Our party wall surveyors in Kent can help you with this.
What are the chimney breast removal building regulations?
Removing a chimney breast is a structural alteration and will require building regulation approval. Structural engineering drawings and calculations need to be submitted to building control before you start work. These will detail the steel beams that may be needed to ensure any remaining parts of the chimney or chimney breast are properly supported, or gallows brackets for chimney support. More information is on the LABC Front Door website.
What if the chimney breast I want to remove is on a party wall?
If the chimney breast is shared your next door neighbour, and if they are on a party wall, you should never remove a chimney breast without following party wall procedures. For further guidance, take a look at our Party Wall FAQs.
It is English Law that you must notify all adjoining owners if you intend to carry out building work which involves work on an existing party wall or party structure. If work starts without a notice being given and an agreement being reached, an adjoining owner might be able to stop the work through a court injunction or seek other legal redress.
It’s often a better idea to get a surveyor involved at the start to prevent any issues. They can advise you and serve the correct notices. Any mistake can invalidate the whole process, so it’s always best to have a professional party wall surveyor on board.

How do I serve a party wall notice for chimney breast removal?
At least two months before you start work, you must serve a written notice to your neighbours telling them what you are going to do. If the building next to you has been converted into flats, your chimney breast still goes through the whole building, so you will need to notify each of the tenant’s flat owners, as well as the freeholder of the whole building – so if there are two flats that will be three notices and three agreements to get.
The Party Wall Act states clearly what needs to be included in a notice, and it is essential that you put this in writing to your neighbour.
Once you have ticked these boxes, do not assume your neighbour will simply agree.
If they do agree, you must get it in writing and it must be signed by them.
If they don’t agree, then a party wall dispute has begun and surveyors must be appointed. You will need to appoint a surveyor to assist with any dispute and your neighbours need to appoint one too, but you should try to get your neighbours to use one surveyor, ideally the same as yours. This is known as an Agreed Surveyor.
Get party wall assistance with Collier Stevens